Self-motivated, ambitious and dedicated Mechanical Project Engineer with 10 years professional experience in FMCG Production
plant Utilities & HVAC System erection, installation and commissioning complete in all respect. Accomplishing Mechanical
projects within budgetary constraints and targeted timelines is my prime objective throughout my career by following Company
HSE compliance. I am interested to work in dynamic, team oriented, competitive and co-operative environment in well reputed
organization, where there is maximum chance of learning and grow as a proficient, innovative and a committed person.
Professional experience
Deputy Manager Mechanical Projects July 2023-onward
Reported to: GM operation & Projects
Details of Projects Executed:
Confectionery section
Memak Fusion Bubble Gum plant’s erection & installation work in progress.
Gibs Food unit 4 Makhan Badami plant erection & installation work in progress.
Bakery section
Pasta Plant Short cut Line 2 (PAVAN Italy) utilities installation work in progress.
Utilities section
Saim Mubeen Food unit 2 Quality control Lab HVAC system planning, equipment installation and
commissioning of Air & water side circuits as per Eurovent certified Hygienic standards.
HVAC system installation work in progress for Gibs Food Products Ltd and Saim Mubeen Food unit4 Multan, it
is comprised of HVAC system design to installation phase with EuroKlima ceiling suspended Eurovent certified
units capacity 450 USRT.
Extension of Saim Mubeen unit 2 Chiller’s Plant room with addition of 2000 USRT cross flow cooling tower and
pumping station for condensing and evaporating circuits .
Extension & revamping of Volka Food centralized Chiller plant in progress.
Assistant Manager Mechanical Projects April 2021-June 2023
Reported to: GM operation & Projects
Confectionery section
China LollyPop plant installation along with requisite utilities.
China chocolate kitchen & Bunty coating plant along with requisite utilities installation.
Winkler+ Dünnebier GmbH Jelly Plant and Jelly Curing room erection, installation along with requisite utilities.
BOOM BOOM Bubble Gum plant installation along with requisite utilities.
Shell Molding Line (Memak Turkey) @ 18 MPM Utility installation in all respect.
Bakery section
Haas Meincke Biscuit Line 1(1500mm X 60000mm @ 1500 Kg/hr. capacity) utilities installation.
Haas Meincke Line 2 (1500mmX50000mm @ 3000 kg/hr. capacity) Utility installation.
Haas Meincke Cupcake plant auto line installation along with requisite utilities.
Imaforni cookies lines (A3, A4) installation along with requisite utilities.
Cake Rusk plant (Iran line) Utilities installation along with requisite utilities.
FEN Italy Snack plant utilities installation along with Complete utilities i.e., hot water generator, air cooled
chiller and water treatment plant.
Utilities section
Confectionary unit’s 2000 USRT water cooled centralized air conditioning system accompanied by Euroklima
Italian hygienic AHU’s selection, erection, installation & commissioning complete in all respect.
Confectionary unit’s Compressor room planning, equipment selection, installation and commissioning with
capacity of 500 KW Air Cooled, rotary screw compressors and relevant dryers complete with storage and distribution system.
VFI unit’s Toffee Plant’s 2 Glycol Chillers (Clivet Italy) planning, erection and installation with cooling towers,
Pumps and piping network.
VFI unit’s Revamping and extension of 4200 USRT existing HVAC system with addition of 900 x2 M3/hr. cooling
tower complete in all respect.
New Flour Mill overhead tanks water distribution system designing, installation and commissioning completed.
SM unit 4 LPG storage tanks 30 M-Ton capacity along with 40 MM BTU SNG generation system installation and
commissioning work successfully completed.
Senior Project Engineer February 2018 – March 2021
Reported to: Sr. Manager Mechanical & Projects
Utilities section
1000 USRT centralized air conditioning system complete with absorption chiller, pumping station, piping,
AHUs and DFCUs installation and commissioning complete in all respect.
20 MM BTU Jinu Dev SNG plant along with 30 M-TON LPG storage capacity installation and commissioning
as per OGRA and Explosive department standards.
90KW & 55 KW Air Cooled, Oil injected rotary Screw Compressors (ATLAS Copco) installation complete with
piping and distribution network.
200 USRT Trane VSD Screw Water Cooled Glycol based screw chiller installation for Ice water supply with
complete requisites.
VFI 3200 USRT HVAC system installation for B-B 4 Biscuit lines installation consisting of Shaungliang Absorption
chiller, Yaunhing china cooling Tower, KSB Pumps and Eurovent certified AHU’s.
SMFIL Factory over all utilities management and piping network installation complete in all respect.
Confectionery section
3D Jelly (Baker Perkin) 1000kg/hr. Baker Perkin plant installation along with required utilities.
Two Depositing Candy 1000kg/hr. each (Chocotech) kitchen and WDS forming system installation along with
requisite utilities.
TFT Kitchen (Creamy, Marsh Mallow) @ 250-800 Kg/hr. for Cookie capper system installation with requisite
utilities.
Mechanical Project Engineer 2016-2018
Bakery Section
PAVAN –Italy short cut Pasta line (3400 kg/hr.) utility installation, erection and commissioning containing gas
Boiler, air cooled chiller and Reverse Osmosis Plant.
PAVAN –Italy LONG cut Pasta line (2400 kg/hr.) utility installation, erection and commissioning containing gas
Boiler, air cooled chiller and Reverse Osmosis Plant.
Confectionery section
Hansel Processing - Hard Candy line 2000kg/hr. line installation along with requisite utilities.
Hansel Processing - Pectin Depositing Toffee 1000 kg/hr. line installation along with required utilities.
Jr. Project Engineer Mechanical 2016-2017
Confectionery section
Hansel Processing – Éclair Line 1500 kg/hr. Installation with requisite utilities.
Hansel Processing Filly Line 750 Kg/h installation with requisite utilities.
Caotech- chocolate Ball Mill kitchen 1500kg/hr. Installation with required utilities.
Hansel Processing- Chocolate Bar Line kitchen 750kg/h and Aastad Denmark forming line installation with
required utilities.
Boom Bubble Gum line (Proform, Euromec, and Thegarten Pactec) installation with complete utilities.
Utilties section
1 MW capacity BIOGAS plant erection, installation as mechanical project team member.
Submitted Energy Audit report 2016 for Electrical Connecting/Running load, Utilities including Steam,
Compressed Air and Natural Gas consumption.
KSB- RO Plant 20m3/hr. erection, installation and commissioning having 5 m3/hr. mineral drinking water
station.
Management Trainee Office l 2014-2015
Reported to: Manager Mechanical Maintenance
Utility lines Piping and instrumentati0n diagrams layout & rout mapping of entire factory.
Imaforni wire cut Cookies +molder line Biscuit Plant Corrective & Preventive Maintenance planning and
execution as per MSAPM.
Handling Improvement action report (IAR) and Record of maintenance (ROM) to overcome breakdown
maintenance.
Machines Down time reports and graphs analysis to for better analysis of machine behavior.
Heat losses control method implementation for steam Boilers by steam traps supervisions.